Stane Park

Completed in August 2018, the development consists of five new restaurants providing Colchester with a 21st century food retail facility. The resturants consist of; Drive through KFC, drive through Starbucks, Nandos, Bella Italia and Coast to Coast. The Work included the highest standards of hardscape and landscaping.  

Read More

Hadleigh Swimming Pool

The construction of a new 25m long, 5.5m wide traditional flush deck swimming pool with balance tank, sauna, changing facilities, pool storage areas and linking corridor to the main leisure facilities. The existing pool was decommissioned and demolished.  

Read More

Manningtree High School, MUGA

A 37m X 64m flood lit coloured permeable asphalt MUGA (Multi-Use-Games-Area) constructed for Manningtree High School. Constructed during the 2016 summer, opening ready for the new school term on 5 September 2016.  

Read More

Curzon Cinema

This project was to refurbish a former Keddies department store that had lain empty for 22 years.  It was located in the centre of Colchester on a busy one way through road leading to one of the town’s railway station. The building was of concrete, steel and brick construction and we refurbished it into a…

Read More